February 16, 2022
The Franklin Parish Library Board of Control met in a called meeting on Wednesday, February 16, 2022. John Guice called the meeting to order with Dorothy Brown and Leslie Young present. Also attending were Ken McManus from McManus Engineering and Wesley Canady from Malone Corporation. The completion of the roofing project was discussed including timeline for completion, the final inspection of the roof, adding thirteen plates to metal on the roof, routing a drain pipe for better drainage at the Learning Center, insulating stainless steel pipe in the Learning Center, repairing brick on the Library, reducers to be added to downspouts at the back of the library, replacing and routing downspouts behind Genealogy and extending inspection days for the project manager. Following the discussion, Mr. Guice asked for a motion to adjourn. Leslie Young made the motion to adjourn with second by Dorothy Brown.